Underground mining presents additional challenges and obstacles to which the innovative solutions provided by Soil & Dust Solutions overcame and provided a safer, dust-free, healthier, and more productive and efficient work environment.
At Eastplats Crocodile River Mine, located in Brits, South Africa, the mine was faced with a steep decline shaft which was accumulating large quantities of dust which was then being tracked into the shaft making work and general logistics very challenging.
Soil & Dust Solutions was asked to conduct a site assessment of the problem and to advise on a long term solution. Previous attempts at dust control were not successful due to harmful fumes and insufficient performance.
A complete assessment of the area and observation during working hours, revealed substantial amounts of fugitive dust accumulation.
In consideration of the amount of fugitive dust, together with the general environment; the steep incline and the type of vehicles which traffic in and out of these underground mining shafts, the technical managers at Soil & Dust Solutions recommended for these locations to be treated with a permanent wetting agent.
This treatment allows for a surface which will continually increase its compaction, eliminate dust, absorb fugitive dust, and not track on the tyres or vehicles. As it is odourless , when applied underground in the shaft, there are no fumes or irritants.
The products ability to work as a compaction aid resulted in a greatly improved driving surface as well as a dust free area.
![]() | ![]() |
| Entrance to Decline 1 at Zandfontein | Entrance to Maroelabult Decline shaft |
Application was done using a pump and spray system devised by Soil & Dust Solutions, which was attached to a mini bulk container resting in the back of a bakkie or on an underground vehicle for ease of application and movement while underground.
![]() | ![]() | ![]() |
The application process allowed for traffic to flow continuously during the application therefore not interrupting or delaying the mining operations. | ||
![]() | ![]() | ![]() |
Zandfontein before application | Zandfontein during application | Zandfontein after application |
![]() | ![]() | ![]() |
Maroelabult before application | Maroelabult during application | Maroelabult after application |
In providing a holistic and sustainable solution, Soil & Dust Solutions recommended that the sides of the entrance road to decline 1 at Zandfontein also be treated for dust suppression, as this decreased the amount of fugitive dust being tracked or blown onto the Decline area. . | ||
![]() | ![]() | ![]() |
The Engineered Solutions™ provided by Soil & Dust Solutions were specifically tailored to meet the requirements of the client which were to achieve total dust control in the areas in an efficient way and at a cost effective rate, which was sustainable, did not require frequent re-applications, and which was environmentally complaint.
The ease of product application as well as the reduced frequency of re-application for maintenance purposes are extremely important benefits that use of the products provided by Soil & Dust Solutions.
Experienced. Effective. Innovative.
Contact Soil & Dust Solutions for Engineered Solutions ™ that are cost effective and environmentally safe and compliant