The use of a soil stabilizer for sub-base stabilization, wearing course and sealing is not a substitute for standard road design. Construction must be done in accordance with our road stabilization specifications and construction methodology.
The following Soil Laboratory tests matrix are required using different quantities by mass of in-situ-soil / soil stabilizer/ and other components being considered, which incorporate the following TMH Testing Methods:
|
|
| Cut Final Levels and Finish with PT Roller | |
|
|
|
|
| Apply Diluted Mixture as Topical Surface Seal | |
|
|
| Conduct Final Field Density Testing & Compare to initial Laboratory Results | |
|
|
USING OUR SOIL STABILIZATION METHOD WILL SAVE YOU MONEY
WHERE YOU NEED IT MOST
THE COST SAVINGS WILL BE CONTINUAL OVER THE LIFE SPAN OF THE ROAD
WE DO NOT OFFER- QUICK FIX – OR SHORT CUTS
WE PROVIDE ENGINEERED SOLUTIONS™ WHICH ARE COST
EFFECTIVE AND SUSTAINABLE
The sub base constructed will be permanent, while the maintenance requirement for the wearing course surface is only 30-50% of the original application rate of the topical surface seal after a 12-24 month period. The amount required is dependent upon the volume and type of traffic and the overall care taken to keep the wearing course free from fugitive material.
Soil & Dust Solutions provides on site technical assistance and training.
Soil & Dust Solutions will provide the total design and construction services. With our extensive construction equipment including: Bomag MPH deep Milling Machine; CAT 140G Grader, 2 Bomag Steel Drum Rollers; PTR finish roller; Graders, and 4 10,000 lt Water Trucks with customized spray mechanism.
We also have specially designed equipment for use in the most challenging of locations and environments.
WE GUARANTEE THE PERFORMANCE LEVEL OF OUR PRODUCT WHEN APPLIED IN ACCORDANCE WITH OUR SPECIFICATIONS AND STANDARD ROAD BUILDING METHODOLOGY AND TMH/TRH SPECIFICATIONS.