How much is needed and How is it applied?



     Ü QUANTITY AND APPLICTION RATE


     The  coverage  of  the  pavement  protection  solution  depends  on
     many  factors,  including:  oxidation,  permanent  age  and  type,
     chemical damage, etc.  Coverage is determined by a yield test
     strip  that  is  applied  prior  to  final  quotation  and  pricing  to
     determine the average coverage rate which will be required to
     provide  the  highest  quality  surface  with  a  suitable  protective
     barrier.


     Ü APPLICATION:


     The  Pavement  Protection  System  solution  is  applied  by  a  crew  of
     properly trained technicians in order to provide the highest quality
     results obtainable.


     Ü CURING:


     On a standard day (20C degrees with between 50% - 75% relative humidity)
     the curing time to receive traffic is approximately 2.0 hours per single layer. The
     higher the temperature and the lower the humidity, the faster the cure time.





       SPECIAL CONDITIONS:

       Ü Ambient temperature shall be a minimum of 10C degrees and rising.
       Ü Do not apply when rain is imminent or forecast within 8 hours of completed application.
       Ü Application surface must be structurally sound.


































                                                                                    S S                          ® ® ®
                                                                                    S O I L S O L U T I O N SO I L S O L U T I O N SO I L S O L U T I O N S
                     ™ ™ ™
                                                                                    Consider it Solved.
           PAVEMENT PROTECTION SYSTEM PAVEMENT PROTECTION SYSTEM AVEMENT PROTECTION SYSTEM
           P
           ™ ™ ™
   6   7   8   9   10   11   12