SAVINGS ON THE PROJECT ABOVE TO DATE AND COUNTING…
WATER SAVED TO DATE…
3. Mine Haul Road 20km x 30
Water Savings
2 x 70,000 litre tankers watering 10 times per day
140,000 litres x 10 = 1.4 million litres of water per day
511,000,000 litres of water per year (511 million litres of water per year)
Fuel and Cost Savings
Improved road surface with EBS Surface Seal and subsequent elimination of watering and grading the surface resulted in a fuel savings of 2.9 million litres at a cost of $2.7 million USD.
CO2 Savings
A fuel savings of 2.9 million litres equates to a CO2 reduction of 7.7 million kg of reduced carbon emissions
Cost Savings Comparison
Traditional method of watering and grading = 10-year cost $28.9 million
EBS Surface Seal 10-year cost = $3.4 million.
2. Mine Access & Pit Road Project
21 km x 30m
Application of EBS Surface Seal on Access Roads and Haul Roads
COST SAVINGS…
1 Year Savings =US$ 1.4 Million
10 Year Savings =US$ 27.2 Million
The 10 year life cycle cost benefits are based on the fact that once our products are applied the requirement for all remediation work is eliminated including watering, grading and importation and placing of additional road material.
WATER
The water use per day was 416,350 litres x 14 trips per day using 4 CAT 785D water trucks applying a total of 5,828,900 litres per day Water saved in 1 Year: 2.1 billion litres
Water saved in 10 Years: 21 billion litres
By eliminating the use of water trucks and graders
2.4 million litres of diesel (607,596 gallons) was saved! Which equates to CO2 savings of 6.35 million kgs per year
Contact us to see if you qualify for a free Cost & Benefit Analysis Report. The above information is general, our reports will provide quantifiable amounts and detailed recommendations.