Cost & Benefit Case StudiesHaul road quality drives production directly — it sets truck cycle times and cuts cost per ton hauled. Here’s what EBS Surface Seal saved on three real mine sites. |
|
|
|
|
Haul road conditions directly impact productivity and unit costs. Source: Caterpillar Forward Mining, Efficient Haul Roads, A Design & Maintenance Guide. |
A 5% increase in rolling resistance can cut production up to 10% and raise production costs up to 35%. Source: Caterpillar Forward Mining, Efficient Haul Roads, A Design & Maintenance Guide. |

1. Syama Mali Mine Access Road Project
AFTER 5 MONTHS…
Savings = US$ 72,000
Total Net Savings: US$ 60,800
Return on Investment = 542%
3. Mine Haul Road 20km x 30
Water Savings
2 x 70,000 litre tankers watering 10 times per day
140,000 litres x 10 = 1.4 million litres of water per day
511,000,000 litres of water per year (511 million litres of water per year)

Fuel and Cost Savings
Improved road surface with EBS Surface Seal and subsequent elimination of watering and grading the surface resulted in a fuel savings of 2.9 million litres at a cost of $2.7 million USD.

CO2 Savings
A fuel savings of 2.9 million litres equates to a CO2 reduction of 7.7 million kg of reduced carbon emissions

Cost Savings Comparison
Traditional method of watering and grading = 10-year cost $28.9 million
EBS Surface Seal 10-year cost = $3.4 million.
How this was calculated (tap to expand)
|
2. Mine Access & Pit Road Project
21 km x 30m
Application of EBS Surface Seal on Access Roads and Haul Roads
COST SAVINGS…
1 Year Savings = US$ 1.4 Million
10 Year Savings = US$ 27.2 Million
WATER
The water use per day was 416,350 litres x 14 trips per day using 4 CAT 785D water trucks applying a total of 5,828,900 litres per day
Water saved in 1 Year:
2.1 billion litres
Water saved in 10 Years: 21 billion litres
By eliminating the use of water trucks and graders


2.4 million litres of diesel (607,596 gallons) was saved! Which equates to CO2 savings of 6.35 million kgs per year



COST SAVINGS…