Value Engineered Solutions ® for Soil Stabilization, Erosion Control & Sustainable Dust Control

Cost Saving Case Studies

 1. Syama Mali Mine Access Road Project

RESOLUTE-MINING-SYAMA-MINE-AIRSTRIP-PROJECT   8,000 m2 / 9,561 yd 2 of  Road 

   1 km x 8 m / 1094 yd x 8,74 yd  

    Investment of:  US $11,200 

    EBS Surface Seal – Applied April 2016

AFTER 5 MONTHS…

  Savings  = US$ 72,000

 mine-haul-rd-savings-graph Total Net Savings: US$ 60,800

  Return on Investment =  542%  

SAVINGS ON THE PROJECT ABOVE TO DATE AND COUNTING…


WATER SAVED TO DATE…


  2. Mine Access & Pit Road Project

  21 km / 13 Miles of Road

Application of EBS Surface Seal on Access Roads

Durasolution on Pit Roads

Case Study 2 Cost SavingsCOST SAVINGS…

 1 Year Savings  = US$ 1.4 Million 

 10 Year Savings  = US$ 27.2 Million 

The 10 year life cycle cost benefits are based on the fact that once our products are applied the requirement for all remediation work is eliminated including watering, grading and importation and placing of additional road material.

WATER

The water use per day was 416,350 liters x 14 trips per day using 4 CAT 785D water trucks applying a total of 5,828,900 liters per day

 Water saved in 1 Year:
DIESEL REDUCTION = CO2 REDUCTION2.1 billion liters / 554.7 million gallons

By not having to use the Water Trucks and Grader…
2.3 million liters of diesel (607,596 gallons) was saved!