What are the benefits of full-depth reclamation for failed roads?

Full Depth Reclamation (FDR) is a comprehensive rehabilitation technique that addresses structural failures at their source—the base layer. Soil Solutions’ FDR with EBS stabilization transforms failed roads into high-performance infrastructure. What Is Full Depth Reclamation? Process: Pulverize the entire asphalt pavement plus underlying base material to depth

Read more

How to prevent reflective cracking when overlaying old asphalt?

Reflective cracking—where cracks in old pavement propagate through new overlays—is the primary cause of premature overlay failure. Traditional methods provide only temporary solutions. Soil Solutions’ approach eliminates reflective cracking permanently. The Reflective Cracking Problem: Crack Propagation: Cracks in the old pavement base create stress concentrations. As the

Read more

How to incorporate RAP (Recycled Asphalt Pavement) into road construction?

Recycled Asphalt Pavement (RAP) offers enormous sustainability benefits but creates technical challenges when incorporated into road construction. Soil Solutions’ EBS technology enables effective RAP utilization while ensuring excellent road performance. The RAP Challenge: Aged Binder: Old asphalt in RAP has oxidized and hardened, lacking the flexibility and

Read more

How does asphalt recycling with stabilizers compare to traditional repaving?

Traditional asphalt repaving and Soil Solutions’ asphalt recycling with EBS stabilization represent fundamentally different approaches to road rehabilitation—with recycling delivering superior performance, sustainability, and value. Traditional Asphalt Repaving: Process: Remove old asphalt (sometimes), import new aggregate for base repairs, apply new hot-mix asphalt overlay, and leave old

Read more

What is cold in-place recycling for asphalt roads?

Cold In-Place Recycling (CIR) is an advanced, sustainable road rehabilitation method that recycles existing asphalt pavement in place without removing or hauling away materials. It’s revolutionizing how deteriorated asphalt roads are restored. The CIR Process: Step 1 – Milling:  A Reclaimer/ Recycler mills the existing asphalt pavement

Read more