Soil Solutions together with our Angolan partner proposed a long-term solution for erosion control using our Engineered Base Stabilizer (EBS) applied as a surface seal to preserve and protect the prepared land, which was accepted by the Government in order to protect the investment until further work on the project is able to commence.
Read more →Soil Solutions is very proud to be part of the Binona Radio Control Race Track construction project – Clay soil compacted & treated with EBS surface seal
Read more →Soil Solutions was contacted by BG Bolivia to provide a method of stabilization and dust control for the La Vertiente runway. The existing problems included loose gravel, the loss of fine material, low visibility, dust conditions and a slippery surface when wet.
Read more →Acacia Mining informed Soil Solutions of their intent to both widen & lengthen the existing airstrip at the Bulyanhulu Mine & once completed to apply EBS
Read more →