Soil Solutions and the Owo local government have partnered to begin improving roads in the Ondo State.
Read more →An area of the Molege Road link to the Owo Township Road was selected to perform a demonstration with the Engineered Base Stabilizer (EBS) to show the advantages over the asphalt method.
Read more →We have been awarded a 300 hectare project by Kalgold Harmony in South Africa
Read more →Mine tailings are the waste product produced by mines. The amount of waste is immense as tons of ore are mined to produce only ounces or pounds of the metal in question.
Read more →Upgrade of Mine Access Roads – Buzwagi Tanzania
Read more →




